Our Projects

NRA PETERSEN GALLERY
This project entailed a complete demolition of the existing space and the relocation of the NRA’s museum into the South Atrium. Once the store was relocated, the entire job was completed in two months. Long-lead-time items were identified and ordered. Shop drawings were produced and approved within a week, enabling us to integrate elaborate casework with state-of-the art LED lighting and an extremely sophisticated HVAC system to minimize heat gain within the casework to help preserve these priceless artifacts for future generations to admire.